 |
onservation
Zones: are the designated areas off
lot lines where tree removal, grading and
clearing are prohibited in these zones.
reservation
Zones: Any removal of trees in these zones with a diameter of 6" or
greater must receive approval.
|
 |
 riveway
Corridor: a designated area in which all utilities must be located within
this
corridor. |
|
uilding
Envelope: a desiganated area from the building foundation where no
tree replacement is required.
ransition
Zone: specific area from the building envelope where any removal of
trees 6” in diameter or greater must be replaced.
|
 |